Wednesday, 1 March 2017

Time Plan Evolution

1st time plan:





Red Week = Half Term/Christmas Break


This was posted on the 19th of September 2016


2nd Time plan:





My initial time plan shows naivety as i planned to have 6 Weeks as buffer weeks. I have changed this to a more realistic time plan that I plan to follow. However, I am behind on the creation of the storyboard and the digipak plan as i underestimated how long they would both take. As a result I have left one week blank so that I have time to do finish them off. Moreover, I have also changed how many tasks that I planned to do in one week as I found myself being overwhelmed with work. I have also changed the estimated finish date to a more realistic date as I initially planned to be finished by the 30th of January. So, I hope to follow this time plan more closely than I did with the first one.


This was posted on the 7th of November 2016

3rd Time plan:



This time plan is similar to the previous one, however i have added an additional section for the evaluation. This shall be completed once the main tasks are finished.


This was posted on the 9th of November 2016

4th Time plan:




I made a third time plan for myself around mid January to see how much I had missed and what was left to complete. The time plan changed again as I had to revise for my mock exams and so I was not very productive in producing my media coursework. So I rearranged my plans so that I would finish on time. I had to change the storyboard multiple times due to technical difficulties and audience feedback, which consequently pushed back all of my other plans so I had to make time for everything and do multiple tasks in the same week. At school I would focus on the technical side of things, editing and photography, whilst at home I would focus on the tasks that I was behind on, like the digipak and website plan. I wanted to leave at least two weeks for editing as from previous experiences, I know that it is the most time consuming part of the process. It also determined the quality of my main product - the music video, so I didn't want to rush it as it was a crucial step in the process.



This was posted on the 27th January 2017

Final Time plan:





This was posted on the 14th of March 2017

I was just about able to stick to my Final time plan, however some minor changes had to be made. For instance, I had to spend more time than I had expected to make the digipak and website as my target audience provided a lot of feedback to improve both of them. 

Since completing the project, i have reorganised my blog so that the posts are in a step by step order so that the examiner/viewer can follow the design process of each product easily. This also makes all the changes that I have made to the product clear to the examiner so the individual can see that I am responding to and incorporating audience feedback to make sure that my products appeal to my target audience. I have also changed the dates of my blog so that they can follow this order. Moreover, I have made the homepage my introductory statement so they viewer instantly knows what this blog is about, however it meant that I had to make it my most recent post.